Working With Customers To Add Value
Over 75 Years Of Experience In Industry
Getting The Job Done Right
Laydown Concrete Column Skip (1000 Litre)
POADescription
- Produced by industry leaders Secatol (including patented design)
- It is also supplied with a 200mm diameter, 3 metre long, heavy duty hose which will prevent any segregation.
- The Gate is operated by a nylon rope attached to a spring return lever ensuring excellent control whilst allowing the operator to control the pour from ground level
- This is a TIC rollover type concrete skip which means the skip sits in the horizontal position for filling and reverts to the vertical when in use